BGP2 Procurement Opportunity

Details of the opportunity:

Steel Partitioning – Workshop Areas

Double Skin Steel Partitioning 3.000m High

Solid to 1.200m Single Glazed to 2.022m Solid above

Doors to include Vision Panels and Key Locks 6mm Clear Toughened Glass

Powder Coated white

1 – Run 30.503m to include 4 no Standard Double Doors & 6 no S/G/S panels

3 – Runs 8.000m Solid

2 – Runs 8.000m Solid to include 1 no Standard Double Door in each run

1 – Run 2.691m Solid

1 – Run 5.553m Solid to include 1 no Standard Single Door

1 – Run 1.650m Solid

Single Skin Built As Double Skin for wall lining to blockwork wall

1 – Run 32.153m Long

Strip curtain to weld bay

Ceilings

600mm x 600mm Plastic Faced Plasterboard tiles Laid into a White Tee Grid

100mm insulation pads laid over the suspended ceiling tiles

Wire Suspended from Galvanised Support Beams

Facia to exposed edges

Area 275 m2

 

All the above for the sum of £xxxxx.xx

Lighting and Power

Supply, deliver and install

40 No 600 x 600 LED panel lights laid in suspended ceiling grid

Emergency lighting as required

43 No double sockets, faced fixed, cables in trunking (not 3 compartment trunking)

All wired back to the existing distribution board

 

For the sum of £ xxxx.xx

Fire alarm – Budget Sum £ xxx.xx

Jumbo Stud Wall

Supply, deliver and install jumbo stud and plasterboard wall near the roller shutter.

Tape, joint and paint finish.

Steelwork allowed for within the wall for partial strip out if required in the future.

Double door within the wall, currently allowed for each door leaf to be 1200mm wide x 2400mm high. Size to be confirmed.

 

For the sum of £ xxxx.xx

Extra Over Items

Supply and install open and close vents in doors

For the sum of £ xxx.xx

 

All prices to be quoted excluding VAT

Please note

Lead time is approx. X weeks from order.

Terms of Payment: XXXX

What is required from all interested parties

Please register interest with p.harper@midwaymanufacturing.co.uk

If a site survey or dwg file of the unit is required, no problem, just let us know asap.

How successful candidate will be chosen

Best prices and to be specified as per above with same/similar quality of materials.

Lead time of installation is imperative and needs to be 6 weeks or under.

Working over the Christmas period is desirable.

Deadline and details of how to apply

All applications must register interest with p.harper@midwaymanufacturing.co.uk

Official quote should be submitted by the 4th December at 5pm and have the reference – Midway Scientific RFQ001